Client: TEi Construction Services
Location: Gordonsville, Virginia, USA
Size: N/A

The Industrial team was retained by TEi Construction Services to provide a detailed heat recovery steam generator (HRSG) economizer bundle replacement lift plan within tight project space and interference limitations. The team extensively leveraged their in-house 3D laser point cloud scanning abilities and 3D CAD modelling to determine optimum crane selection and placement for the high risk lifts.  Deliverables included coordination with crane and equipment vendors, specification of all lifting hardware, determining minimum/maximum lift angles/loads, and related erection drawings.

Other Power Generation Projects

Industrial & Manufacturing

Combustion Optimization

Industrial & Manufacturing

Litoral de Almeria Power Station

Industrial & Manufacturing

North West Redwater Sturgeon Refinery

Industrial & Manufacturing

Pressure Part Replacement

Industrial & Manufacturing

Pulverized Coal Wall-fired Burner Design

Industrial & Manufacturing

Superheater Header & Pendant Replacement